INDEPENDENT TRANSFORMER BUYER / LOUISIANA-WIDEsaleselectricalbuyers@gmail.com   (614) 715-3047
Substation transformers connected to a high-voltage grid
LOUISIANA TRANSFORMER BUYERS

Sell a 35 kV class Transformer in Louisiana

We buy used, surplus and decommissioned transformers across Louisiana. Send the nameplate and tell us about your equipment for a cash offer.

USED + SURPLUS + DECOMMISSIONEDWE BUY. WE NEVER SELL.
Photo: Mosbatho / CC BY 4.0; resized/cropped for display
01Payments Upfront
02No Testing
03We Cover All Freight
04All Voltage Classes Bought

Document voltage details for 35 kV class

A transformer associated with 35 kV class should be described by its complete nameplate, not by a partial voltage label alone. A buyer may need to distinguish the incoming and outgoing ratings, phase, frequency, and tap arrangement, along with capacity and construction. If a marking is unclear, report that uncertainty rather than filling in the missing number.

Voltage identification is a paperwork and observation task for the seller, not an instruction to measure a live circuit. Keep personnel away from exposed electrical parts and use existing photographs or records when safe access is unavailable. Qualified workers must manage all electrical isolation and related safety work.

For equipment described as 35 kV class, confirm the class designation and exact rated primary and secondary winding voltages from the nameplate or drawings. Share the kVA, phase, insulation level, taps and condition; a voltage class is not itself the exact operating voltage.

Keep electrical details in context

Voltage can be written in volts or kilovolts, and the nameplate may show several tap or winding values. Preserve the original wording and identify which rating belongs to which side when the plate states it. A photograph is helpful because an abbreviated description can omit information that distinguishes the unit.

The buyer may also need the kVA, number of phases, and frequency to understand the transformer. Where a nameplate cannot be read, use existing drawings or records and note any uncertainty. Do not interpret a voltage marking as proof that the equipment is safe to touch or ready for removal.

Turn nameplate information into an inventory

Start with the information already on the transformer. The plate may identify the manufacturer, model, serial number, capacity, voltage, phase, frequency, and cooling class. A seller can photograph a safely accessible plate or use an existing image. If the plate cannot be reached without entering a restricted area, use available records and explain the limitation instead.

Add a wider photo and a short note on enclosure condition, known damage, and included accessories. A numbered list is especially useful when similar transformers are stored together. Do not substitute a guess for a missing rating, and do not claim that a transformer works merely because a nameplate is present.

  • Use one identifier for each unit and its related photographs.
  • Describe which detachable accessories are included in the sale.
  • Flag uncertain information and restrictions on site access.

Separate physical observations from assumptions

An exterior photograph can show the enclosure, bushings, corrosion, or an apparent leak, but it cannot by itself establish internal condition. Describe visible observations and known history separately. If accessories have already been removed or a tank has sustained damage, identify that fact and indicate whether the parts are included in the proposed transaction.

The seller does not need to conduct transformer testing. Send existing documentation if it is available and relevant, and identify its date rather than suggesting a historical result describes today's condition. If the buyer needs clarification, discuss what information exists without disturbing equipment or creating an unnecessary electrical or environmental hazard.

Plan around operations and release dates

A data center decommissioning, bitcoin mining facility closure, hospital or campus closure, or distribution upgrade can leave multiple electrical assets with different owners and release dates. A transformer serving a backup or temporary load may not be ready simply because nearby equipment has been removed. Separate equipment already in storage from equipment that is still installed.

Document the responsible site contact, anticipated availability, and any known limitations on access. If several buildings or yards are involved, assign each unit to the correct location. A buyer can then discuss an offer and transportation in the context of the actual project rather than a generic shutdown timetable.

Compare the proposed terms with the actual inventory

Before accepting an offer, check that the proposed equipment list corresponds to the physical transformers and their locations. Review the condition description and any identified exclusions, including components that will remain at the site. Equipment characteristics and practical access affect an evaluation; there is no reliable universal price based on rating or location alone.

Offers and any upfront payments are subject to written terms agreed by both parties. The written agreement should specify the price, timing of payment, transfer of ownership, and the responsibilities attached to the sale. Clarify any conditions before committing resources or arranging a release from the facility.

Make pickup practical for both parties

The buyer covers freight, and the parties should coordinate a pickup plan around the actual equipment and site. Explain how the transformer will be reached, whether a loading area is available, and what is known about its weight and dimensions. Include any restrictions on vehicle size, site entry, or the hours when equipment may be moved.

Separate transportation from preparation at the site. Electrical disconnection, rigging, lifting, staging, and loading may involve different people and equipment. The written agreement should identify who arranges those tasks and when the transformer is to be released. Never assume that a truck can collect a unit still surrounded by active equipment.

Leave isolation and handling to qualified personnel

Photograph equipment only from a safe, authorized position. An idle-looking transformer may still be energized, fed from another source, or located near exposed equipment. Qualified personnel must perform isolation, lockout and tagout, verification of de-energization, and disconnection in accordance with the site's procedures. Removal should not begin until the responsible team has released the unit.

For liquid-filled units, report known leaks and provide existing fluid or environmental documentation if available. Do not open, drain, sample, or move a transformer merely to describe it to a buyer. Appropriate specialists should address any necessary fluid management, containment, and transport preparation under the requirements that apply to the particular equipment.

A clear path from information to handoff

Begin with the equipment list and safely available photographs, then explain ownership, location, condition, and anticipated availability. The buyer can review the information and discuss whether a purchase is appropriate. Resolve discrepancies in the inventory and identify any missing information rather than allowing an uncertain description to become an assumed fact.

If the parties decide to proceed, document the offer, payment terms, freight plan, and site responsibilities. Coordinate release with qualified site personnel and keep a record of which units and accessories are transferred. This sequence supports a practical sale while leaving operational and safety decisions with the people responsible for the site.

READY WHEN YOU ARE

Your transformer has value. Let's talk.

Start with the nameplate. Tell us what you have and where it is, and we’ll discuss a cash offer and the next steps.

(614) 715-3047

saleselectricalbuyers@gmail.com

Text Nameplate Photos

No obligation. We buy transformers; we do not sell them.

Request a Quote

Fields marked * are required.

Photos: 10 MB combined maximum. Your submission is processed by FormSubmit and emailed to us; FormSubmit says submission data is retained for 30 days. Please do not include sensitive personal information. You can also text or email your photos directly.

Request a Quote